← Portfolio

Façade signs for L’Ensemble

Product

Signs, plaques and wayfinding

The project

The signs were intended for the façade of L’Ensemble’s new space. The post documents the project before installation.

The documented panel has a vertical format and arranges the information in two sections, headed ‘Formación’ and ‘Arquitectura’. Several lines of white text sit beneath each heading on a dark purple background.

On 15 January 2015, the signs were presented as awaiting only installation on the façade. This record therefore captures the stage before installation rather than the finished signs in place.

Processes and materials: fabrication services · available materials · studio machinery.

Want something similar for your brand?

We adapt processes and materials to your budget and your timelines.

Request a quote